About Us
Work We've Delivered
Real projects, real results — built with precision and creativity.
Ongoing Projects
Landfill Gas (LFG)
Capturing methane from landfills to generate clean energy and reduce emissions.
Credits Available
TBA
Energy
Biomass
Converting agricultural waste into sustainable energy solutions.
Credits Available
TBA
Renewable
Pyrolysis Oil
Transforming waste tires into valuable fuel through advanced pyrolysis technology.
Credits Available
TBA
Waste-to-Energy
Biogas
Harnessing organic waste to produce clean, renewable biogas.
Credits Available
TBA
How It Works
BSF (Black Soldier Fly)
Innovative waste management using black soldier fly larvae.
Credits Available
TBA
Organic
Eco Bricks
Sustainable construction materials from industrial waste and sludge.
Credits Available
TBA
Construction
Tea Garden
Oodalia Tea Garden in Chattogram - sustainable agriculture with carbon benefits.
Credits Available
TBA
Agriculture
Biochar
Carbon sequestration through biochar production from agricultural residues.
Credits Available
TBA
Carbon Removal
Completed Projects

220 MW Shajibazar Power Plant Project, Bangladesh.
Client Name : Shajibazar Power Plant
Main Contractor : China Energy – NEPC
Work Name : Piling & Soil Development.
Work Period : 2014

300,000 Pcs CC Brick Supply Project
Client Name : Somota Developer Company
Main Contractor : B&F Company Ltd.
Work Name : 300,000 pcs CC Brick Supply
Work Period : 2019

Construction of Pre-Fabricated Steel Shed
Client Name : SMILE ARTS Company Ltd.
Main Contractor : B&F Engineering & Construction Limited
Work Name : Construction of Pre-Fabricated Steel Shed with Mezzanine Floor, Generator, Substation, Canteen, Prayer Room, Breast Feeding, Medical, Daycare Center, Guard & Fire Room, Internal Road & Boundary Wall.
Work Period : 2024

Mohora & Kalurghat Water Treatment Plant Rehabilitation Project.
Client Name : Chittagong WASA, Bangladesh, Ministry of LGED, Government of Bangladesh
Main Contractor : B&F Company Limited
Work Name : Geo-Technical Investigation Topography & Traffic Survey
Work Period : 2014

Far East spinning project
Client Name : Far East Group
Main Contractor : B&F E&C Limited(EPC)
Work Name : Underground Ducting
Work Period : 2014

Feasibility Study on Karnaphuli Bridge Project.
Client Name : Korea Exim Bank
Main Contractor : B&F Company Ltd.
Work Name : Geo-Technical Investigation, Topographical survey
Work Period : 2015

Construction of Pre-Fabricated Shelter in 14-Border Out Posts (BOP) in hill tracks area in Bangladesh.
Client Name : Border Guard Bangladesh, Ministry of Homes, Government of Bangladesh.
Main Contractor : B&F Engineering & Construction Ltd.
Work Name : Design, Material Supply and Construction for Contractor’s Construction of Pre-Fabricated Shelter in 14-Border Out Posts.
Work Period : 2016

The Construction of Kanchpur, Meghna, Gumti 2nd Bridge and Existing Bridge Rehabilitation Project (Package No. PW-01).
Client Name : Dept. of Roads & Highways, Ministry of Road Transport & Bridges, Government of Bangladesh.
Main Contractor : OSJI JV
Work Name : Design, Supply and Construction for Contractor’s Accommodation for Local Staff for Kanchpur, Meghna, Gumti Yard.
Work Period : 2016

Matarbari Ultra Super Critical Coal Fired Power Plant Project
Client Name : Coal Power Generation Company Bangladesh Limited
Main Contractor : Sumitomo IHI-Toshiba, GC-POSCO E&C
Work Name : Geo-Technical Investigation, Topographical survey
Work Period : 2017

Matarbari Ultra Super Critical Coal Fired Power Plant Project
Client Name : Coal Power Generation Company Bangladesh Limited
Main Contractor : Sumitomo/POSCO
Work Name : 503 Meter Macadam Road (community road) in project area.
Work Period : 2018

Factory Renovation Work (Floor Dismantling & Civil work)
Client Name : KiDO Dhaka industrial Ltd.
Main Contractor : KiDO Dhaka industrial Ltd.
Work Name : Factory Renovation Work
Work Period : 2022

Feasibility Study on Karnaphuli Bridge Project
Client Name : Korea Exim Bank
Main Contractor : B&F Company Limited
Work Name : Geo-Technical Investigation, Topographical survey
Work Period : 2016

Consulting Service for Karnaphuli Rail-Road Bridge Project
Client Name : Bangladesh Railway, Ministry of Railway, Government of Bangladesh
Main Contractor : YOOSHIN Engineering Corporation
Work Name : Geo-Technical Investigation Topography & Traffic Survey for Karnaphuli Rail-Road Bridge, Chittagong as a Local Consultant.
Work Period : 2015

Detailed Engineering Design Work for BRT Line-3 Corridor in Dhaka
Client Name : Dhaka Transport Coordination Authority(DTCA)
Main Contractor : Sunjin Engineering & Architects
Work Name : Detailed Engineering Design Work
Work Period : 2013 ~ 2016

Consultancy for Preparation of Detail Land use Plan of Matuail Sanitary Landfill Area.
Client Name : Dhaka South City Corporation
Main Contractor : B&F Company Limited
Work Name : Geo-Technical Investigation, Topographical survey, WTE, Landfill
Work Period : 2018

Consultancy for Preparation of Detail Land use Plan of Matuail Sanitary Landfill Area.
Client Name : Dhaka South City Corporation
Main Contractor : B&F Company Limited
Work Name : Design, 3D Animation & Reporting
Work Period : 2018

Detailed Design and Construction Supervision for Bangabandhu Sheikh Mujib Medical University and General Hospital
Client Name : Bangabandhu Sheikh Mujib Medical University (BSMMU)
Main Contractor : B&F Company Limited
Work Name : Detailed Design and Construction Supervision
Work Period : 2016 ~ 2020

315 KVA Substation Setup at B&F Factory, Keranigonj, Dhaka.
Client Name : B&F Engineering & Construction Ltd.
Main Contractor : B&F GROUP
Work Name : Setup 315 KV Substation
Work Period : 2019

Setup Solar Irrigation Pump & Solar Home System in Borendra Area in Rajshahi. KOICA Fund, Korean Government.
Client Name : REB Bangladesh, Ministry of Power & Mineral Resource, GoB.
Main Contractor : DAESUNG Energy, Korea
Work Name : Setup Solar Irrigation Pump & Solar Home System and Maintenance.
Work Period : 2013

KOICA BCC Project
Client Name : DAESHIN GLOBAL NETWORKS CO., LTD.
Main Contractor : B&F International Co., Ltd.
Work Name : Coordinator, Network & System Consulting, Equipment Install, System Management.
Work Period : 2004 ~ 2007
